六六字典>英语词典>dilapidation翻译和用法

dilapidation

n.  破损;崩塌;荒废

复数:dilapidations 

GRE法律

BNC.33264 / COCA.40504

英英释义

noun

  • the process of becoming dilapidated
      Synonym:ruin
    1. a state of deterioration due to old age or long use
        Synonym:decrepitude

      双语例句

      • The characteristics of the packed goods are convenient storage, not dilapidation easily and lowering the packaging cost.
        包装后的物品具备储运方便,不易破损,降低包装成本作用。
      • Based on developing instruments of visual procedure, this paper proposes a system of data collection and evaluation of pavement dilapidation, which performs upon pavement images acquired by CCD camera and gives emphasis to the interaction of computer and operator.
        以可视化程序开发工具VB为基础,开发了一种路面破损数据采集与评价系统,该系统以CCD摄像机所采集的路面图像为工作对象,强调在数据采集过程中的人机互动。
      • Regularly inspecting high voltage power transmission line and repairing dilapidation are essential to keep power supply reliable.
        定期对高压架空输电线路进行故障的检测与修复,是供电可靠性的基本保证。
      • The MTs use isolated DC/ DC module to provide power for dilapidation detectors, avoiding lightning strike.
        终端采用了隔离DC/DC模块为崩塌传感器提供电源,防止雷击对终端其它模块的影响。
      • This paper introduces the treatment method and construction technique of laying bituminous concrete pavement on the dilapidation cement concrete road surface in old road rebuilding.
        本文介绍的是在破损的水泥混凝土路面上进行沥青混凝土路面铺筑时,旧路面的处理方法和施工工艺。
      • The forepart dilapidation of the road surface is one of the main harm of the asphalt road,, so the prevention and improve measure should be taken pertinence.
        路面早期破损已成为沥青路面的主要危害之一,应有针对性地采取一系列预防和改善措施。
      • System of Data Collection and Evaluation of Pavement Dilapidation Based on VB
        基于VB的路面破损数据采集与评价系统的开发
      • Wasted iron mine were integrated utilized to prevent the occurred of dilapidation. From purification and callback to cure waste water pollution.
        铁尾矿的综合利用来防治崩塌、滑坡的发生;对于废水污染主要从废水净化和回收利用进行处理。
      • Roof stress-distribution and surface subsidence rock movement are studied respectively by 3D FEM code ANSYS before and after ore pillar dilapidation and roof cutting.
        应用三维ANSYS有限元程序研究了切顶与矿柱崩落前后顶板的应力分布状态和岩体移动情况。
      • Inly introduce geologic prospecting, plan selecting, punching blast design, main points of construction technique during disposing the large volume of bottom empty mined area by the way of dilapidation using long deep-hole blast with joint stairs, and the achievements after blasting.
        主要介绍用并台阶长深孔爆破崩落法处理底部大容积采空区过程中的地质勘探,方案选择、穿爆设计、施工技术要点,以及爆破后取得的成果。